how long to let base coat dry before clear

Best answer 30 and 40 minutes People also ask How long after base coat can you clear coat (and why)? As we said, wait for around 30 minutes after the base coat application and then proceed for the clear coat. The main intention is to let the base

Best answer


30 and 40 minutes

People also ask


  • How long after base coat can you clear coat (and why)?

  • As we said, wait for around 30 minutes after the base coat application and then proceed for the clear coat. The main intention is to let the base coat dry properly. Most of the time, the base coat takes somewhere between 30 and 40 minutes to completely dry.

  • How long to let paint dry before clear coat?

  • How long to let paint dry before clear coat? Couldnt find it on the can, how long should I let the color coat dry before I apply a clear coat? Thanks. The folks that sold you the paint should know, or at least have a tech sheet on it. My observations have been within 24 to 48 hours for the brand (s)I’ve seen.

  • How long does it take for stripe tape to dry?

  • However, assuming you have applied the normal film build with the base coat and you’ve used the proper temp range of the reducers/additives for the colors, the base coat should be dry enough to gingerly begin applying stripe tape within 45 minutes to an hour.

  • How long does it take for polyester base to dry?

  • Heavy polyester type bases i would clear within 24 hours, such as Wanda, Diamont although i have tested Wanda 14 days later then cleared (setting in breezeway) and then let set a week and the adhesion tester showed no weakness.

    Leave a Reply